Project overview
These photos were taken by Mr Robjent who kindly let us use them, they show perfectly how we complete our work. The first photos show the bathroom as it was The second show the bathroom tiles and sanitryware removed The bath/shower tray and pipework is then installed Then the electrics are put in place by our fully qualified electritian The walls are then plastered and the floor is ply covered and screwed down every 150cm or 6" The tiles are then installed And finally all the fittings are instaled As you can see there is a large transformation.![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |